Architecture Projects

  • Gorgan Airport Passenger Terminal

    Construction includes a half level mezzanine 8400 Sq M, pilgrims terminal.

    • Client:
      Iran Airport Company
    • Project start:
      1391/5/31
    • Design project duration:
      2 Mo
    • Project manager:
      Ms.Masoumeh Ataee
    • Architect Designer:
      Ms.Fouzieh Alikhani
  • Kish Airport Heli Hangar

    Includes a half level mezzanine 100 Sq M, Bell 212 plan.

    • Client:
      Petro Tadbir Pars Co.
    • Project start:
      1391/12/5
    • Design project duration:
      2 Year
    • Project manager:
      Mr.Mohammad Sohrabi
  • Asman Ray Airport FFR building

    2270 Sq M building in one and half level, contains one ambulance unit, four fire trucks, one fire vehicle and a water tank.

    • Client:
      Iran Airport Company
    • Project Duration:
      15 Mo study time
    • Project manager:
      Ms.Masoumeh Ataee
  • Khoamabad Airport terminal and Pavion building

    1020 Sq M building in one level with two waiting halls.

    • Client:
      Lorestan road & Urban development Office
    • Project start:
      1392
    • Design project duration:
      6Mo
    • Project manager:
      Ms.Masoumeh Ataee
    • Designer:
      Ms.Sepideh Borhani
    • Construction Project Manager:
      Mr.Kouros Araghi
  • Payam Karaj Airport, Entry Gate structure

    This structure was designed with helicopter wings in mind.

    • Client:
      Payam Airport
    • Project start:
      1387
    • Design project duration:
    • Project manager:
      Ms.Masoumeh Ataee
    • Construction Project Manager:
      Mr.Gholamreza Ghaseminejad
  • Asman Ray, Arya far Airforce Base, Entry gate structure

    This design resembles flight form constructed in entry-exit gate at Asman Ray.

    • Client:
      Iran Airport Company
    • Project start:
      1390
    • Physical Progress:
      100%
    • Project manager:
      Ms.Masoumeh Ataee
    • Designer:
      Ms.Elmira Najafi
  • 7 مشخصات پروژه

    توضیحات

    • Client:
      Iran Airport Company
    • مبلغ قراداد
      20.000.000.000ریال
    • Design project duration:
      12 ماه
    • Project manager:
      مهندس معصومه عطایی
    • مدیر پروژه اجرایی
      مهندس کورس عراقی
  • 8 مشخصات پروژه

    توضیحات

    • Client:
      Iran Airport Company
    • مبلغ قراداد
      20.000.000.000ریال
    • Design project duration:
      12 ماه
    • Project manager:
      مهندس معصومه عطایی
    • مدیر پروژه اجرایی
      مهندس کورس عراقی
  • 9 مشخصات پروژه

    توضیحات

    • Client:
      Iran Airport Company
    • مبلغ قراداد
      20.000.000.000ریال
    • Design project duration:
      12 ماه
    • Project manager:
      مهندس معصومه عطایی
    • مدیر پروژه اجرایی
      مهندس کورس عراقی
  • 10 مشخصات پروژه

    توضیحات

    • Client:
      Iran Airport Company
    • مبلغ قراداد
      20.000.000.000ریال
    • Design project duration:
      12 ماه
    • Project manager:
      مهندس معصومه عطایی
    • مدیر پروژه اجرایی
      مهندس کورس عراقی